Steel application

Tundish Refractory Lining Materials

Tundish linings support steel cleanliness, controlled flow, thermal management and safe sequence casting. The working lining, permanent lining and flow-control surroundings must be considered together.

ZONE-BY-ZONE REVIEW
01

Working liningSteel contact, insulation and clean removal

02

Impact zoneTurbulence, erosion and local reinforcement

03

Permanent liningStructural support and repeated cycles

04

Cover & furnitureHeat retention and flow management

Operating challenge

What drives refractory wear

  • Steel cleanliness and inclusion control
  • Rapid heat-up and sequence duration
  • Erosion around impact and flow areas
  • Efficient deskulling and turnaround

RFQ inputs

What the technical review needs

  • Tundish capacity, drawing and sequence practice
  • Working-lining installation method
  • Preheat conditions and casting duration
  • Current wear, deskulling and repair observations
Full RFQ checklist

Procurement FAQ

Questions to resolve before quotation

What tundish layers should be included in an RFQ?+

Identify the working, permanent and insulation layers plus impact pads, covers, joints and any flow-control surroundings within the requested scope.

Can spray or dry-vibratable working linings be reviewed?+

Yes, when the installation equipment, turnaround, preheat practice, removal method and service target are provided.

Why does preheating matter?+

Preheat practice affects moisture removal, thermal shock, steel-temperature loss and safe commissioning of the complete lining.

Application-specific RFQ

Send the drawing, operating conditions, current lining and wear pattern.

Send Project Details
WhatsApp